RENEWABLES & ENERGY

INNOVATING THE DELIVERY

Bumpers - 99MW BESS

Successful delivered the HV package at Europe’s largest BESS, totalling 198MWh. 

Energised in October 2023, this cutting-edge battery energy storage system plays a crucial 

role in stabilizing the GB electricity grid while supporting the transition to renewable energy. 

The site features 56 Tesla 2-hour duration Megapacks, delivering a total capacity of 99MW 

and 198MWh—enough to power approximately 225,000 homes for two hours. These 

batteries are integrated with 28 high-capacity 4200kVA 33kV/480V Wilson T2 Eco trans 

large distribution transformers and two 150kVA 33kV/415V units. By providing critical grid-

balancing services, this project enhances energy reliability and facilitates the reduction of 

fossil fuel dependency. 


CONTACT OUR TEAM

Wormald Green - 30MW BESS

Responsible for the full electrical and fibre package at a 33MW/66MWh BESS. 

Designed to enhance grid resilience and support the transition to renewable energy, this 

advanced battery energy storage system can power approximately 200,000 homes for two 

hours. By providing additional capacity during peak demand, it plays a vital role in 

stabilizing the GB power grid and managing fluctuations in renewable energy supply. 

Envision Energy led the supply, installation, and maintenance of the 2-hour duration Battery 

Energy Storage Systems, ensuring efficient and reliable operation.


CONTACT OUR TEAM

Hawthorn Pit - 49MW BESS

Delivery of a full electrical and fibre package at a 49.9MW/99.8MWh BESS. 

Located in Durham, this advanced battery energy storage system enhances grid stability and 

supports the integration of renewable energy. With the capacity to power approximately 

200,000 homes for two hours, it provides essential frequency regulation and load balancing 

during peak demand. The system features 2-hour duration Battery Energy Storage Systems, 

supplied, installed, and maintained by Envision Energy. Our team was responsible for 

delivering the full electrical and fibre package, ensuring seamless connectivity and efficient 

operation. 


CONTACT OUR TEAM

Yellow River - 101MW Windfarm

Responsible for the MV and Fibre package at a 100MW Wind Farm in Rhode, Co. Offaly. 

Located in Ireland, this wind farm will generate enough low-carbon renewable energy to 

power 66,000 homes annually while offsetting 65,000 metric tonnes of carbon emissions per 

year, contributing significantly to Ireland’s 2030 renewable energy targets. The site consists 

of 29 wind turbines, scheduled for commissioning in early 2025. Our team was responsible 

for delivering the full MV and fibre package, ensuring efficient power distribution and 

seamless communication infrastructure. 

CONTACT OUR TEAM

Stella - 78MW BESS

More Information Soon

Full write up coming soon

CONTACT OUR TEAM
Share by: